Fire Sprinkler System in Saudi Arabia

Multi Goals designs, installs, tests and maintains every type of fire sprinkler
system in Saudi Arabia. From wet pipe and dry pipe to pre-action, deluge and
foam water sprinkler systems, we deliver each fire fighting sprinkler system
fully hydraulically calculated, NFPA 13 compliant and Civil Defense approved
for occupancy certification.

A fire sprinkler system in Saudi Arabia controls a fire in the minutes before Civil Defense arrives. Each sprinkler head holds a glass bulb or fusible link that breaks at a set temperature, so only the heads directly over the fire open. The rest of the building stays dry. This is why an automatic fire sprinkler system limits damage instead of flooding a floor, and why NFPA 13 treats sprinklers as the primary life safety layer in commercial and industrial buildings.

Multi Goals designs, supplies, installs and commissions every fire protection sprinkler system type across the Kingdom. Based in Al Khobar and operating nationally, we size each system with full hydraulic calculations against the NFPA 13 hazard classification of your building, not a rule-of-thumb head count. Every fire sprinkler system installation ends with a witnessed hydrostatic test and a commissioning report, the documentation Civil Defense requires before it issues the occupancy certificate.

Based on our project experience, the most common cause of sprinkler rejection at Civil Defense inspection in Saudi Arabia is a hazard classification error at design stage. A warehouse designed to Ordinary Hazard density but storing flammable goods needs Extra Hazard density, and the shortfall only appears when the reviewer checks the calculations. We classify the occupancy first, then size the system, which is why our designs pass review the first time.

Get a Quote

Our Fire Protection Services in Saudi Arabia

The right fire fighting sprinkler system depends on the temperature, the contents and the risk level of the space it protects.
Multi Goals installs all five types below, each designed to NFPA 13 and sized by full hydraulic calculation. Use this section
to identify which system your building needs before you request a quotation.

Wet Pipe Sprinkler System

Wet Pipe Sprinkler System

The wet sprinkler system is the most common design in Saudi Arabia and the simplest to maintain. Water sits in the pipework at all times, so the moment a head opens, water discharges with no delay. This makes it the fastest responding system and the cheapest to install and service. It suits offices, hotels, malls, hospitals, apartment towers and any heated indoor space where the pipes will never drop near freezing. A wet pipe system has fewer moving parts than any other type, which also means fewer failure points at annual inspection. For most commercial buildings in the Kingdom, this is the default automatic sprinkler system we specify.

Dry Pipe Sprinkler System

A dry sprinkler system holds pressurised air or nitrogen in the pipework instead of water. When a head opens, the air escapes, the dry pipe valve trips, and water fills the pipes and discharges. The dry pipe sprinkler system exists for one reason: it protects spaces where standing water in the pipes would freeze or where the pipe route passes through an unheated area. In Saudi Arabia we install dry pipe systems in cold stores, freezer warehouses, chilled distribution centres and unheated loading canopies. The trade-off is a short delay between head activation and water discharge, so NFPA 13 limits system volume and requires the water to reach the most remote head within a set time. We size the dry pipe valve and air compressor to meet that limit.

Dry Pipe Sprinkler System
Pre-Action Sprinkler System

Pre-Action Sprinkler System

A pre action sprinkler system keeps the pipes dry and adds a second safeguard: a separate detection system must confirm a fire before water enters the pipework. In a double interlock design, both the detector and the sprinkler head must operate before any water discharges. This near-eliminates the risk of accidental water release from a damaged head or a knocked pipe. We install pre-action systems in data centres, server rooms, archives, museums, control rooms, telecom exchanges and any space where a false discharge would cost more than the fire. The system requires a pre-action valve, a solenoid, a dedicated detection loop and a releasing panel, all of which we supply and commission together.

Foam Water Sprinkler System

A foam water sprinkler system injects foam concentrate into the water supply through a proportioner, so the discharge blankets a burning liquid instead of spreading it. Water alone can push a flammable liquid fire wider. The foam sprinkler system smothers the fuel surface and holds the vapour down, which is why NFPA 16 governs it separately from standard sprinkler design. We install foam water sprinkler systems in fuel storage areas, aircraft hangars, generator halls, paint booths, solvent stores and petrochemical plants. Design covers both the water demand and the foam concentrate demand, including the proportioner, the bladder tank and the concentrate reserve required for the full discharge duration.

Foam Water Sprinkler System
Deluge Sprinkler System

Deluge Sprinkler System

A deluge sprinkler system uses open heads with no bulb or link, so every head in the zone discharges at once when the deluge valve opens. A detection system triggers the valve. Because the whole area is wetted instantly, the deluge fire sprinkler system is reserved for high hazard risks where fire spreads across a surface faster than individual heads could respond. In the Kingdom we install deluge systems over transformers, oil-filled equipment, aircraft hangars, chemical process areas, fuel loading gantries and petrochemical structures in Jubail and Yanbu. Deluge design demands accurate water supply calculations, because every head flows simultaneously and the peak demand is far higher than a wet pipe system of the same area.

Sprinkler System Components We Supply

Multi Goals supplies every part of the fire fighting sprinkler system from the water source to the last head. All sprinkler system components we supply are UL Listed or FM Approved and carry current Civil Defense and SASO certification:

  • Sprinkler heads: pendent, upright, sidewall, concealed and recessed heads in standard and quick response, with temperature ratings and K-factors selected to match each area.
  • Control valve assembly: alarm check valve for wet systems, dry pipe valve with accelerator, pre-action valve with solenoid and releasing panel, or deluge valve, depending on system type.
  • Riser and distribution pipework: black steel and galvanised pipe, grooved and threaded fittings, mechanical couplings, hangers, seismic bracing and sway restraints.
  • Flow and supervision devices: waterflow switches that signal the fire alarm panel, tamper switches on every control valve, and pressure gauges either side of the alarm valve.
  • Inspector’s test connection: a calibrated orifice matching the smallest head in the system, so the annual flow test proves real operating conditions.
  • Fire department connection: a Civil Defense compliant FDC with check valve and drain, letting responders boost pressure into the system from an appliance.
  • Water supply: fire water storage tank sized to NFPA 22, suction pipework and the fire pump set covered in the next section.

Every component ships with manufacturer data sheets, test certificates and UL or FM listing documentation for the Civil Defense submission package.

Sprinkler System Components We Supply

Sprinkler System Requirements Under NFPA

Saudi Civil Defense reviews sprinkler designs against NFPA. The sprinkler system requirements
NFPA sets out start with one decision: how you classify the occupancy. That classification fixes
the design density, the operating area and therefore the water supply and pump size for the whole
building. Get it wrong and the design fails at review.

Sprinkler System Hazard Classification

Hazard ClassTypical BuildingsDesign Approach
Light HazardOffices, schools, hospitals, hotel rooms, places of worshipLowest density, widest head spacing
Ordinary Hazard Group 1Car parks, bakeries, electronics plants, laundriesModerate density
Ordinary Hazard Group 2Retail, workshops, machine shops, general warehousesHigher density and demand
Extra Hazard Group 1Metal working, plywood, printing with flammable inksHigh density, close spacing
Extra Hazard Group 2Flammable liquid handling, paint dipping, plastics processingHighest density, often foam

Alongside the hazard class, the codes that govern a compliant fire sprinkler system in Saudi Arabia are:

  • NFPA 13: design and installation of sprinkler systems, covering density, spacing, obstruction rules and hydraulic calculation.
  • NFPA 20: installation of the fire pumps that feed the sprinkler system.
  • NFPA 22: water tanks for private fire protection.
  • NFPA 24: private fire service mains between the tank, pump and building.
  • NFPA 25: inspection, testing and maintenance of the installed system.
  • NFPA 16: foam water sprinkler and foam water spray systems.

Multi Goals produces the full hydraulic calculation set, drawings and equipment schedules that Civil Defense requires at design approval stage, then builds exactly to the approved drawings.

Fire Pumps for Sprinkler Systems

Fire Pumps for Sprinkler Systems

Municipal water pressure in most Saudi Arabian buildings cannot deliver the flow a sprinkler system needs at the most remote head. Fire pumps for sprinkler systems close that gap. The pump set is sized from the sprinkler hydraulic calculation, so the pump and the sprinkler design must be engineered together, never separately.

  • Electric fire pump: the primary duty pump in most commercial installations, starting automatically within ten seconds of a pressure drop, driven by a UL 218 listed controller.
  • Diesel fire pump: required by NFPA 20 in high-rise buildings and wherever the electrical supply cannot be guaranteed, with an eight-hour fuel reserve.
  • Jockey pump: maintains standby pressure and absorbs minor leakage so the main pumps do not start on every small pressure fluctuation.

Every pump set we install is UL Listed, NFPA 20 compliant and handed over after a witnessed three-point acceptance test recorded on the NFPA 20 Acceptance Test Form.

Our Fire Sprinkler System Installation Process

Every fire sprinkler system installation we deliver follows the same six stages, from first site visit to Civil Defense sign-off:

  • 1. Site survey and hazard classification. We walk the building, record ceiling heights, storage arrangements and obstructions, and set the NFPA 13 hazard class for each area.
  • 2. Hydraulic design and drawings. We produce the calculations, head layout, pipe sizing and pump duty, then issue shop drawings for approval.
  • 3. Civil Defense submission. We submit the drawings, calculations and equipment certificates and answer reviewer comments until approval is granted.
  • 4. Installation. Our teams install pipework, hangers, bracing, valves, heads and the pump set exactly to the approved drawings.
  • 5. Hydrostatic and flow testing. We pressure-test the pipework, flush the mains, and run the flow and alarm tests before anything is concealed.
  • 6. Commissioning and handover. We witness the final tests with the authority, hand over as-built drawings and O&M manuals, and register the system for maintenance.
Fire Pumps for Sprinkler Systems

Fire Sprinkler System Testing and Maintenance

Civil Defense requires documented fire sprinkler system testing to NFPA 25 as a condition of annual licence renewal.
A system that was commissioned correctly still fails inspection if the test records are missing. Multi Goals runs the
full NFPA 25 schedule and issues signed certificates after every visit.

Sprinkler System Inspection and Testing Intervals

Weekly to Monthly
Control valve position and seals, gauge readings, dry pipe air pressure
Quarterly
Waterflow alarm test, alarm devices, supervisory signals, FDC condition
Annually
Main drain test, inspector’s test connection flow, head and pipe inspection, hanger and bracing check
Every 5 Years
Internal pipe inspection for obstruction, corrosion and scale
Head Sample Testing
Standard heads at 50 years, quick response at 20 years, dry heads at 10 years, then every 10 years

Main drain results get compared against the original commissioning figures. A drop in the reading points to a deteriorating water supply or a partly closed valve, and finding that in a routine test is far cheaper than finding it during a fire.

Fire sprinkler head types installed in office, warehouse, residential and industrial buildings

Sprinkler Head Types (NFPA 13)

  • Standard pendent, most common; installed through ceilings facing down for commercial occupancies
  • Standard upright, for exposed plant rooms and open warehouse ceilings
  • Concealed and decorative, flush or cover-plate heads for hotels, offices and finished ceilings where appearance matters
  • Sidewall, wall-mounted for corridors and hospital rooms where ceiling installation is impractical
  • ESFR (Early Suppression Fast Response), mandatory for high-bay warehouse storage above 7.5m
  • Residential, for residential towers per NFPA 13R with simplified hydraulic requirements

NFPA 13 Hydraulic Calculations, Why They Are Mandatory

NFPA 13 requires full hydraulic calculations for all sprinkler systems. The calculation models the complete pipe network, applies Hazen-Williams friction loss at every pipe section, identifies the most hydraulically remote design area, and verifies that the system delivers the required design density in litres per minute per square metre over the required area at the available inlet pressure. A design without calculations is not an NFPA 13-compliant design, and will not pass the Civil Defense commissioning flow test.

Frequently Asked Questions

We install wet pipe, dry pipe, pre-action, deluge and foam water sprinkler systems across Saudi Arabia, all designed to NFPA 13 with full hydraulic calculations. Wet pipe suits most heated commercial buildings, dry pipe suits cold stores, pre-action protects data centres and archives, deluge covers high hazard areas, and foam water sprinkler systems handle flammable liquid risks.

Contact Multi Goals for a free site survey. Our engineers classify the hazard, produce the hydraulic calculations and head layout, and give you a fixed-price quotation covering design, supply, fire sprinkler system installation, Civil Defense submission, testing and commissioning.

Yes. We deliver fire sprinkler system installation across every region of Saudi Arabia from our Al Khobar headquarters, including Riyadh, Jeddah, Dammam, Jubail, Yanbu, Makkah and Madinah.

No, and this is the most common misunderstanding about sprinklers. In a wet, dry or pre-action system, each head opens on its own when heat breaks its bulb or link, so only the heads over the fire discharge. The only exception is a deluge sprinkler system, which uses open heads and floods the entire zone by design.

A wet sprinkler system holds water in the pipes at all times and discharges instantly. A dry pipe sprinkler system holds pressurised air, and water only enters after a head opens and the dry pipe valve trips. Dry systems exist for cold stores and unheated spaces where standing water would freeze.

No. Carbon dioxide discharges through fixed nozzles into a sealed room, not through sprinkler heads, so it is a gas suppression system under NFPA 12 rather than a sprinkler system under NFPA 13. For occupied rooms we recommend a clean agent such as FM200 or Novec 1230 instead, because CO2 is unsafe for anyone still inside.

The core sprinkler system components are the heads, the riser and distribution pipework, the control valve assembly, waterflow and tamper switches, pressure gauges, the inspector’s test connection, the fire department connection, the water storage tank and the fire pump set. Every component we supply is UL Listed or FM Approved with SASO and Civil Defense certification.

NFPA 25 sets weekly and monthly valve and gauge checks, quarterly waterflow alarm tests, an annual main drain and full inspection, and an internal pipe inspection every five years. Civil Defense requires these records for annual licence renewal, so missing paperwork can hold up your building licence even when the system itself is sound.

A pre action sprinkler system, usually double interlock. The pipes stay dry until a detector confirms a fire and a head opens, so a damaged head or a knocked pipe cannot release water over live equipment. Many data centres pair it with a clean agent system for faster suppression.

Get in Touch

Planning a fire sprinkler system in Saudi Arabia? Contact Multi Goals for hazard classification, hydraulic design and a fixed-price
quotation anywhere in the Kingdom. Whether you need a wet pipe system for a commercial tower, a dry pipe sprinkler system for
a cold store, a pre-action system for a data centre or a foam water sprinkler system for a fuel facility, our engineers will survey
your site, run the calculations and deliver a complete proposal within 48 hours.